Monday, May 22, 2006

New Layout progress

Well here I am with more info on the new layout
as you can see I am moveing right along with the
foam. The foam is 3" thick and I am glueing it down
with floor adhesive after I am finshed with this part
I will start laying down the road bead. I will be useing
a 1/4 VINYLBED ROADBED on the main line and
nothing on the all sidings and yards. More info soon.

Saturday, May 06, 2006

More New Layout

The new layout will be all remote control even the turning on and off
of the power. Iwill use all Lionel Trainmaster Command Control (TMCC)
with no visible control panel. I will control the Atlas O switches with
Lionel SC-2 and all the lighting and operating accessories will be controled
with Lionel SC-1 . As I move forwerd I will show progres and up date
info.

Tuesday, May 02, 2006

The New Layout

Here is the start of my new layout it was designed with RR Tracks program
witch I find a great investment. Iam useing all Atlas O track and switchs.
The bench work is constructed of 1x4,1x3 and 2x3with 1/2" pllywood
top this is more then suitable for any layout . I glued on top of the 1/2"
plywood 3"FOAMULAR rigid foam insulation.